The project is split over several phases.
TheThe first phase encompasses the strip out and refurbishment of six Casemates (Casemate Numbers 1 – 3 (Block A) and Numbers 4 – 6 (Block B)).
TheThe scope of this phase of works includes:
- Asbestos Removal.
- Minor repairs and reinstatement work to the roofs, lightwells and façades as necessary.
- Replacement of windows and external doors.
- New internal doors and finishes including wall, floor and ceiling.
- Removal of fixtures and reinstatement where directed.
- MEP works including basic lighting and heating.
TheFuture phases will see site wide land remediation, asbestos removal, demolition of existing structures and a complete redesign and rebuild of the entire plot into a high-end mixed-use wellness destination and experience.
DESIGN RISK MANAGEMENT CHALLENGES TO MITIGATE / COMMUNICATE & MANAGE:
The Citadel is a Scheduled Ancient Monument which means it is a nationally important archaeological site or historic building which is given protection against unauthorised change.
This has result in a host of design, planning and construction challenges.
Land contamination and remediation.
Presence of various hazardous materials across the site / within existing structures.
Structural integrity of certain existing structures.
Working at height in the vicinity of the revetment / moat.
Logistics planning for construction – access / egress / deliveries / waste away / buildability and sequencing / lifting Fire and Emergency arrangements.
Environmental Management.
- Client
- Tech Fest Ltd
- Dates
- 2022 - TBC
- Value
- TBC
Project Team
- Principal Designer
- Stonewells
- Architect
- Hollaway Studio
- Mechanical Engineer
- Innovo Engineering Ltd
- Electrical Engineer
- Innovo Engineering Ltd
- Civil Engineer
- TBC
- Structural Engineer
- TBC
- Fire Engineer
- TBC
- Sustainability Consultant
- TBC
- Planning Consultant
- DPP Planning
- Ecology Consultant
- Greenspace Ecological Solutions Ltd
- Heritage Consultant
- Historic England
- Project Manager
- Core 5
- Cost Consultant
- Core 5
- Approved Inspector
- Harwood AI
- Principal Contractor
- TBC